GreenTeam Renewables offers flexible rental periods and competitive pricing for the Vermeer PD10. Whether you need the equipment for a single day or several months, we have an option to fit your project.

Delivery and pickup to your site can be arranged (additional transport fees may apply).

Proof of adequate equipment insurance is required (or a damage waiver can be provided).

Our team is available for phone support and maintenance guidance throughout your rental.
The Vermeer PD10 is a dedicated solar pile driver designed to meet the tight tolerances required for large-scale solar array foundation installation. By renting the PD10 from GreenTeam Renewables, your team can handle post pounding in-house with a machine known for accuracy, efficiency, and reliability.
With an integrated auto-plumb system, the PD10 automatically adjusts its mast to a perfectly vertical position at the push of a button. This ensures each steel pile is driven plumb (straight) into the ground, reducing rework and guaranteeing that your solar array foundations meet engineering specifications.
Equipped with a high-frequency hydraulic hammer delivering up to 1,500 blows per minute, the PD10 drives posts quickly and firmly. This high impact rate means faster installation times—essential for utility-scale projects—and helps keep your solar construction schedule on track.
The PD10 can integrate with GPS and laser guidance systems to precisely position each pile. Your crew can install every pier at the correct location, depth, and angle on the first try. By minimizing surveying time and human error, the PD10 ensures consistent alignment across the entire solar field.
Built with a robust 4-cylinder diesel engine and a two-speed rubber track drive, the PD10 navigates challenging terrain while minimizing ground disturbance. It can handle pile sizes up to 20 feet long (W or C piles), accommodating the demands of most solar array foundations. The intuitive controls (dual joysticks and optional remote operation) enable a single operator to safely and efficiently manage the pile-driving process.
Ready to drive your solar project forward with the right equipment? Contact GreenTeam Renewables today.